Yes, we built THAT! These images serve as a testament to the accomplishments that our expert and resolute Team members can achieve under any circumstances! The success of our project with Hycroft Mine / Allied Nevada Gold Truck Shop and Maintenance Facility proved an impressive feat, due to its remote location fifty-six miles west of Winnemucca, Nevada near the Black Rock Desert. This project consisted of the design, permitting, and construction of an 80-foot-tall turnkey facility to provide for the service of 325-ton mining haul trucks.
Serving an all-encompassing design-build and CM@R role, Agate Construction built the project in seven short months and installed four 50-ton overhead bridge cranes, oil, antifreeze and fluid tanks and systems, as well as fuel island systems, and four, 65-foot-tall rubber entry doors to accommodate these giant vehicles. With an “all in” design-build approach in mind, we skillfully tailored this mining project to the client’s specific needs, accelerated timeframe, and budget.